...
首页> 外文期刊>Nefte Compass >Tapi Pipeline Progress Slows to Snail’s Pace
【24h】

Tapi Pipeline Progress Slows to Snail’s Pace

机译:Tapi管道进度减慢到蜗牛的步伐

获取原文
获取原文并翻译 | 示例

摘要

Despite trumpeting the start of work in December on the $10 billion-plus Turkmenistan-Afghanistan-Pakistan- India (Tapi) gas pipeline, progress has been minimal, Turkmen industry sources say. "They formally started the first welding, but the project is still in its early preliminary stages and it’s not sure when they will make the second and the third welding. However, everything is in place and ready for the next push, the next breakthrough," one source said.
机译:土库曼斯坦的业内消息人士称,尽管在去年12月启动了耗资100亿美元的土库曼斯坦-阿富汗-巴基斯坦-印度(Tapi)天然气管道的开工,但进展甚微。 “他们正式开始了第一次焊接,但是该项目仍处于初期初步阶段,不确定何时进行第二次和第三次焊接。但是,一切就绪,为下一步的工作,下一步的突破做好了准备,一位消息人士说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号