【24h】

BIPM REPORT

机译:BIPM报告

获取原文
获取原文并翻译 | 示例
       

摘要

As I write, we are in the process of preparing our future workplan for 2009 to 2012. This will be presented to the annual meeting of NMI Directors and to the International Committee for Weights and Measures in October 2006. The key points are: That we shall consolidate our recent expansion into chemical metrology and will carefully align our future work to international issues and drivers such as climate change and air quality issues. As the priorities for biosciences are not yet clear, we plan an international collaborative study of the main issues as preparation for the next BIPM workplan due to start in 2013. A catch-up in physical metrology where previous budgetary settlements have led to insufficient resources to deliver a previously agreed workplan. Specifically we propose to replace a number of staff who have left but whose posts were not filled, in mass and time metrology.
机译:在我撰写本文时,我们正在准备2009年至2012年的未来工作计划。该计划将提交给NMI董事年度会议和2006年10月的国际度量衡委员会。关键点是:将巩固我们最近在化学计量学领域的扩展,并将使我们未来的工作与国际问题和驱动因素(例如气候变化和空气质量问题)保持一致。由于生物科学的优先事项尚未明确,我们计划对主要问题进行国际合作研究,为将于2013年开始的下一个BIPM工作计划做准备。物理计量学的追赶,以前的预算结算导致资源不足,交付先前商定的工作计划。具体来说,我们建议以数量和时间计量代替一些已离开但职位未填补的员工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号