When teaching setup reduction, one of the first principles I try to explain is related to what I call the "core tasks" required to make a setup. Core tasks are the physical tasks a setup person must perform in order to get the machine ready to run production. For atypical CNC machining center, these tasks can include (among others): 1) Tear down the previous setup and put everything away. 2) Make the workholding setup. 3) Determine program zero assignment values. 4) Enter program zero assignment values (typically into fixture offsets). 5) Assemble the cutting tools. 6) Measure the cutting tools. 7) Enter offsets for the cutting tools. 8) Load the program. 9) Run the first workpiece. 10) Inspect the first workpiece and, if necessary, make adjustments. 11) Repeat the last two steps until the workpiece passes inspection.
机译:在讲授简化设置的过程中,我尝试解释的第一个原则与进行设置所需的“核心任务”有关。核心任务是安装人员必须执行的物理任务,以使机器准备好开始生产。对于非典型的CNC加工中心,这些任务可能包括(其中包括):1)拆除之前的设置并将所有东西收起。 2)进行工作夹具安装。 3)确定程序零分配值。 4)输入程序零分配值(通常输入夹具偏移量)。 5)组装切割工具。 6)测量切削工具。 7)输入切削工具的偏移量。 8)加载程序。 9)运行第一个工件。 10)检查第一个工件,必要时进行调整。 11)重复最后两个步骤,直到工件通过检查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号