首页> 外文期刊>Memory & cognition >Allocating time to future tasks: The effect of task segmentation on planning fallacy bias
【24h】

Allocating time to future tasks: The effect of task segmentation on planning fallacy bias

机译:将时间分配给将来的任务:任务分段对计划谬误偏差的影响

获取原文
获取原文并翻译 | 示例
           

摘要

The scheduling component of the time management process was used as a "paradigm" to investigate the allocation of time to future tasks. In three experiments, we compared task time allocation for a single task with the summed time allocations given for each subtask that made up the single task. In all three, we found that allocated time for a single task was significantly smaller than the summed time allocated to the individual subtasks. We refer to this as the segmentation effect. In Experiment 3, we asked participants to give estimates by placing a mark on a time line, and found that giving time allocations in the form of rounded close approximations probably does not account for the segmentation effect. We discuss the results in relation to the basic processes used to allocate time to future tasks and the means by which planning fallacy bias might be reduced.
机译:时间管理过程的调度组件用作“范式”,以调查对未来任务的时间分配。在三个实验中,我们将单个任务的任务时间分配与组成单个任务的每个子任务的总时间分配进行了比较。在所有这三个中,我们发现为单个任务分配的时间明显小于分配给各个子任务的总时间。我们将此称为分割效果。在实验3中,我们要求参与者通过在时间线上放置标记来进行估算,并发现以舍入近似逼近的形式进行时间分配可能无法说明细分效果。我们讨论与用于将时间分配给未来任务的基本过程有关的结果,以及可以减少计划中的谬误的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号