首页> 外文期刊>Modern Power Systems: Communicating Power Technology Worldwide >First 6 MW PMG comes off the line at St Nazaire
【24h】

First 6 MW PMG comes off the line at St Nazaire

机译:首批6兆瓦PMG在圣纳泽尔下线

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

In February GE Power Conversion successfully completed manufacture of the first serial permanent magnet generator to be made at GE Renewable's offshore wind factory in Saint-Nazaire, northwest France. The 6 MW PMG is among the world's largest generators ever built for a WTG and is the first of a series of 300 units that are planned to be manufactured on the site during the next few years. GE inherited the facility as part of its acquisition of Alstom's power business in 2015. The first completed generator is to be installed in a Haliade 150-6MW offshore wind turbine located in Denmark.
机译:2月,GE Power Conversion成功完成了第一台串联式永磁发电机的制造,该发电机将在法国西北部圣纳泽尔的GE Renewable海上风力发电场生产。 6 MW PMG是有史以来为WTG建造的世界上最大的发电机之一,并且是计划在未来几年内在现场生产的300台机组中的第一台。 GE于2015年收购了阿尔斯通的电力业务,并继承了该设施。第一台完整的发电机将安装在位于丹麦的Haliade 150-6MW海上风力发电机中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号