...
首页> 外文期刊>Modern Power Systems: Communicating Power Technology Worldwide >SaskPower Boundary Dam 3 upgrade and CCS: project profile
【24h】

SaskPower Boundary Dam 3 upgrade and CCS: project profile

机译:SaskPower Boundary Dam 3升级和CCS:项目简介

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Project scope: upgrade of Boundary Dam 3 lignite fired power plant and addition of Shell Cansolv capture technology, the world's first large scale post combustion capture facility at an operating coal fired plant. The installed capacity of the upgraded BD3 pulverised coal plant is around 110 MWe. Estimates of plant efficiency, "energy penalty" associated with carbon capture and storage, etc, are expected to be available early in 2015, by which time the refurbished plant and CCS equipment should be fully operational. The captured carbon dioxide (1 million t/y) is being compressed and supplied to Cenovus for use in enhanced oil recovery (via a 66 km long pipeline) in oil fields near Weyburn. Carbon dioxide can also be piped to a storage demonstration facility 2 km from the power plant (Aquistore).
机译:项目范围:升级边界大坝3号褐煤发电厂,并增加壳牌Cansolv捕集技术,这是世界上第一个在运行中的燃煤电厂的大型后燃烧捕集设施。升级后的BD3煤粉厂的装机容量约为110 MWe。预计将于2015年初获得工厂效率,与碳捕集和封存相关的“能源损失”等估算,届时翻新过的工厂和CCS设备应能全面运行。捕获的二氧化碳(100万吨/年)被压缩并提供给Cenovus,用​​于在Weyburn附近的油田中提高采收率(通过66公里长的管道)。二氧化碳也可以通过管道输送到距电厂(Aquistore)2公里的存储示范设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号