...
首页> 外文期刊>Modern Power Systems: Communicating Power Technology Worldwide >China's 1st large supercritical units go commercial at Waigaoqiao site
【24h】

China's 1st large supercritical units go commercial at Waigaoqiao site

机译:中国第一座大型超临界机组在外高桥厂商业化

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The completion of the 2 × 900 MWe Waigaoqiao Phase II coal fired plant in Shanghai marks a further key step in China's adoption of supercritical pulverised coal technology. The country's previous supercritical plants have been in the 600 MWe size range, the first being the Shidongkou 2 × 600 MWe power station, which entered service in 1992 and is also in Shanghai.
机译:上海2×900 MWe外高桥二期燃煤电厂的建成标志着中国采用超临界粉煤技术的又一关键步骤。该国以前的超临界电厂的规模一直在600 MWe范围内,第一个是石洞口2×600 MWe电站,该电站于1992年投入服务,也位于上海。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号