...
首页> 外文期刊>Modern Power Systems: Communicating Power Technology Worldwide >GE ENERGY MARKS H SYSTEM MILESTONES Baglan Bay Hits 8,000 Hours; First U.S. Application Announced
【24h】

GE ENERGY MARKS H SYSTEM MILESTONES Baglan Bay Hits 8,000 Hours; First U.S. Application Announced

机译:GE能源标志H系统里程碑Baglan Bay达到8,000小时;首次公布美国申请

获取原文
获取原文并翻译 | 示例

摘要

GE Energy's most advanced gas turbine technology, the H System, recently surpassed 8,000 hours of operation at the Baglan Bay Power Station in South Wales, U.K. Reaching this milestone, the equivalent of one full year of operation, has demonstrated the success of the H technology and its ability to achieve increased combined-cycle efficiency with exceptional emissions performance.
机译:GE能源公司最先进的燃气轮机技术H系统最近在英国南威尔士的Baglan Bay电站运行了8,000多个小时,达到这一里程碑,相当于全年运行,证明了H技术的成功并具有提高联合循环效率和出色排放性能的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号