首页> 外文期刊>Model Engineer >Building a Gauge 3 Dee: Dick Allan builds an enlarged version of the Gauge 1 Dee - PART 11
【24h】

Building a Gauge 3 Dee: Dick Allan builds an enlarged version of the Gauge 1 Dee - PART 11

机译:建立3号规Dee:Dick Allan建立1号Dee规的放大版本-第11部分

获取原文
获取原文并翻译 | 示例
           

摘要

A good place to start is with the running boards. These are made up integral with the splashers and cab sides and will test your soldering skills severely (drawings 34 and 35 and photo 14). Order the footplate material ready cut to width and slightly overlength. Trim it to the dimensions (check against the job) in the drawing allowing a full 0.031in. overlap over the beams at each end and at the side. Next, cut to length the 1/4 x 1/4in. brass angle valances, silver solder on the downward extension at the front then rivet and solder the valance in place leaving a 0.031in. overlap at the side. Fit to the chassis and check the location of the fixing screws, three each side, and drill 8BA clear and countersink the holes.
机译:一个很好的起点是运行板。它们与挡水板和驾驶室侧面一体构成,将严格测试您的焊接技能(图34和35和照片14)。订购准备好切成一定宽度和稍长的脚踏板材料。将其修剪为图纸中的尺寸(对照作业检查),以允许整个0.031英寸。在两端和侧面重叠在梁上。接下来,将其切成1/4 x 1 / 4in的长度。黄铜角价,在正面向下的延伸部分上焊接银,然后铆钉并将价位焊接到位,剩下0.031英寸。在侧面重叠。将其安装到机箱上,并检查固定螺钉的位置,每侧三个,然后钻8BA孔,然后钻去孔。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号