首页> 外文期刊>Minerals & Metals Review Weekly >New capacity to relieve TN of power crunch
【24h】

New capacity to relieve TN of power crunch

机译:缓解电力紧张状况的新能力

获取原文
获取原文并翻译 | 示例
           

摘要

Over 3,000 Mw of power generation capacity will be added in Tamil Nadu over the next six months, which would alleviate the power shortage in the State, according to K. Venugopal, Member, Tamil Nadu Electricity Regulatory Commission. Power consumption in the State has been increasing by about 9 per cent annually but additions to power generation capacity have not matched the growth in demand. Of the 58 billion units of electricity supplied annually, over 11-12 billion units are being supplied to high tension, primarily industrial consumers. But over the last four years, restriction and control measures have been adopted to tide over the electricity shortage.
机译:泰米尔纳德邦电力监管委员会成员K. Venugopal表示,未来六个月内,泰米尔纳德邦将增加3,000兆瓦的发电能力,这将缓解该州的电力短缺。该州的电力消耗每年以约9%的速度增长,但发电能力的增加却无法满足需求的增长。在每年580亿单位的电力供应中,有11-12亿单位的电力供应给了高压电力市场,主要是工业用户。但是在过去的四年中,已经采取了限制和控制措施来解决电力短缺的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号