In 30 April 2004, a large scale slope failure occurred at the external waste dump of the South Field Mine, in the Western Macedonia Lignite Center, Greece. The South Field Mine located in the South part of Ptolemais lignite basin is one of the largest lignite mines in Europe with an annual production of 18-22 million tons of lignite and total excavations of about 100 million m~3. Current mine production covers the energy needs of the nearby power station of Agios Dimitrios with a total capacity of 1595 MW. The unfavourable ground surface of the area where the dump is located (old river bed, the inclination of ground surface approx 4 percent) and the deposition of the overburden materials over a spring resulted in the development of high pore water pressure in the non consolidated clayly and marly materials.
机译:2004年4月30日,希腊西部马其顿褐煤中心South Field矿的外部废物场发生了大规模的边坡破坏。位于托勒迈斯褐煤盆地南部的南田矿是欧洲最大的褐煤矿之一,年产量为18-22百万吨褐煤,总开挖量约为1亿立方米3。当前的矿山产量满足附近Agios Dimitrios电站的能源需求,总容量为1595 MW。垃圾场所在区域的地面不利(旧河床,地面倾斜度约为4%),春季覆盖层材料的沉积导致非固结黏土中孔隙水压力升高。和马里材料。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号