首页> 外文期刊>Mining Quarrying & Recycling >All in the mix - While asphalt business was a little slow in the UK during 2005 this didn't stop plant being sold both in this country and to overseas markets. MQREYB takes a look at some of the developments and projects
【24h】

All in the mix - While asphalt business was a little slow in the UK during 2005 this didn't stop plant being sold both in this country and to overseas markets. MQREYB takes a look at some of the developments and projects

机译:混在一起-尽管2005年英国的沥青业务有些缓慢,但这并没有阻止工厂在该国和海外市场上的销售。 MQREYB考察了一些开发和项目

获取原文
获取原文并翻译 | 示例
           

摘要

When you say something has been running hot and cold all year it is usually because something is. not functioning properly In the case of the asphalt industry in the UK during 2005 it is more likely to be referring to sporadic demand - as well as the type of mixes used. As president of the Institute of Asphalt Technology, Ian Walsh, points out, local authority demand has not been as it should be with councils choosing a quick fix 30mm SMA overlay rather than analysing the state of roads and going for selected treatments.
机译:当您说某事一年四季都在冷热运行时,通常是因为有些事。不能正常运行对于2005年英国的沥青行业而言,更有可能指的是零星的需求-以及所用混合料的类型。正如沥青技术研究所所长伊恩·沃尔什(Ian Walsh)所指出的那样,地方政府的需求并非如此,因为议会选择了快速固定的30mm SMA覆盖层,而不是分析道路状况并进行选择的处理。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号