...
首页> 外文期刊>Mining Mirror >Failing gold mine sold
【24h】

Failing gold mine sold

机译:失败的金矿出售

获取原文
获取原文并翻译 | 示例

摘要

DRD Gold and Aurora Empowerment System have announced that an agreement has been reached whereby Aurora will acquire from DRD Gold's operating subsidiary, DRD Gold SA, a 60 percent interest in its wholly-owned Blyvooruitzicht Gold Mining Company. The total value of the transaction is R376-million, R296-million of which is payable in cash by June 29 2010. In addition, in terms of the offer, Aurora undertakes to provide a facility of up to R80-million to Blyvoor in respect of working capital requirements. Under the arrangement, Blyvoor was to be able to drawdown R10-million on the facility at the end of December 2009, and going forward, it may draw up to R14-million at each month end thereafter until the end of May 2010. Aurora has also guaranteed DRD Gold, as from the start of the new year, a monthly profit share of R2,5-million or 25 percent of the net operating cash profit, whichever is higher, up to and including the end of the month preceding the expected transaction completion date of June 29 2010.
机译:DRD Gold和Aurora Empowerment System宣布已达成协议,Aurora将向DRD Gold的运营子公司DRD Gold SA收购其全资拥有的Blyvooruitzicht黄金矿业公司60%的权益。交易总价值为3.76亿兰特,其中2.96亿兰特应在2010年6月29日前以现金支付。此外,就要约而言,Aurora承诺向Blyvoor提供高达8000万兰特的融资营运资金需求。根据这项安排,Blyvoor能够在2009年12月底之前提取1000万兰特,并计划在此后的每个月底提取1400万兰特,直到2010年5月。还保证DRD Gold从新的一年开始起每月分红250万兰特或营业现金净利润的25%(以较高者为准),直至并早于预期的月底交易完成日期为2010年6月29日。

著录项

  • 来源
    《Mining Mirror 》 |2010年第7期| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿山开采 ;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号