...
首页> 外文期刊>Journal of Electrical & Electronic Systems >Optimizing Well Integrity Surveillance and Diagnostic for Gas Lift Wells in Mature Fields - Case History in Egypt
【24h】

Optimizing Well Integrity Surveillance and Diagnostic for Gas Lift Wells in Mature Fields - Case History in Egypt

机译:

获取原文
获取原文并翻译 | 示例
           

摘要

GUPCO is one of the major companies in Egypt using Gas Lift for operating more than 500 wells across Gulf of the Suez (GoS). To ensure that wells operate as designed for their assigned life with all risks as low as reasonably practicable, GUPCO initiated an in house Well Integrity Management Policy (WIMP) with combination of well modeling to simulate the operating conditions. WIMP defines the operating standards for maintaining well integrity parameters, securing well potential availability and emphasizing on the problem prevention before happening. In addition, well modelling plays a vital role in such challenging mature fields that helps in decreasing Natural Flow Capability (NFC) physical test frequencies, especially for vast infrastructure.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号