...
首页> 外文期刊>Mineral Planning >Major aggregates proposals
【24h】

Major aggregates proposals

机译:主要骨料提案

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Lincolnshire. Four proposals for sand and gravel extraction have been made; all four applications are subject to Environmental Impact Assessment, and in May the EIA process had only been completed on the two earliest applications at Eagle Hall and Tonge's Farm. Accordingly these two were determined in May and are reported in this issue. The four proposals are:Aggregate Industries (UK) Ltd at Eagle Hall. Reserves 6.7Mt (5.2 years on the landbank).RMC Aggregates (Eastern) Ltd at Tonge's Farm, Norton Disney. Reserves 2.46 Mt (1.9 years on the landbank).C & G Concrete Ltd at Norton Bottoms Quarry. Reserves 2.0 Mt (1.5 years on the landbank).Lafarge Aggregates Ltd at Whisby Quarry. Reserves 3.3 Mt (2.6 years on the landbank).In May, prior to refusing proposals to extract sand and gravel at Eagle Hall, and permitting proposals as an extension to Norton Disney Quarry, Lincolnshire CC considered an overview of the Lincoln/Trent Valley area in terms of sand and gravel production levels, the current landbank of permitted reserves, and guidance on landbanks. The Lincoln/Trent Valley Production Zone is the largest of the three production zones in the County and, during 1991-2000, has produced an average of 1.3 Mtpa of sand and gravel, or 41 percent of the total County production. The current landbank of permitted reserves within this production zone is 5.9 Mt which represents 4.6 years supply, a shortfall from the 7 year landbank recommended in MPG6.
机译:林肯郡。提出了四个提取砂砾的建议;所有这四个申请都需要经过环境影响评估,并且在五月份,仅在伊格大厅和汤格农场的两个最早的申请中完成了环境影响评估程序。因此,这两个问题已在5月确定,并在本期中进行了报告。这四个建议是:Eagle Hall的Aggregate Industries(UK)Ltd。在诺顿迪斯尼的Tonge's Farm储备670吨(土地上有5.2年)。RMCAggregates(Eastern)Ltd。在Norton Bottoms采石场保留2.46 Mt(土地上有1.9年的土地)。在Whisby Quarry的Lafarge Aggregates Ltd储备2.0吨(土地储备1.5年)。保留3.3公吨的土地(土地上有2.6年的土地)。5月,在拒绝提议在Eagle Hall开采沙子和砾石的提议并允许提议作为诺顿迪斯尼采石场的扩展之前,林肯郡CC考虑了对林肯/特伦特河谷地区的概述在砂石生产水平,当前允许的储备土地储备以及土地储备指导方面。林肯/特伦特河谷生产区是该县三个生产区中最大的生产区,在1991-2000年期间,平均生产了1.3兆帕的沙子和砾石,占该县总产量的41%。该生产区内目前允许的储量土地储备为5.9吨,相当于4.6年的供应量,与MPG6建议的7年土地储备相比有所减少。

著录项

  • 来源
    《Mineral Planning》 |2002年第92期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号