首页> 外文期刊>Mining Journal >Syama redevelopment reaches next stage
【24h】

Syama redevelopment reaches next stage

机译:善山再开发进入下一阶段

获取原文
获取原文并翻译 | 示例
       

摘要

RESOLUTE Mining Ltd intends to redevelop its 80 percent-owned Syama gold mine in Mali.The company will spend the next six months working towards a full commitment to the project. Immediate actions will include the selection of a principal engineer for design and construction, and starting the statutory approvals processes. Resolute's consultant, Lycopodium Engineering, has updated a feasibility study of the project, and its report indicates that capital costs have risen by 18 percent to 96.6 million US dollars.
机译:RESOLUTE Mining Ltd打算重建其在马里拥有80%股权的Syama金矿,该公司将在接下来的六个月中努力对该项目做出全面承诺。立即采取的措施包括选择设计和施工的总工程师,并启动法定批准程序。 Resolute的顾问Lycopodium Engineering更新了该项目的可行性研究,其报告显示,资本成本已增长18%,达到9,660万美元。

著录项

  • 来源
    《Mining Journal》 |2006年第7期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿山开采;
  • 关键词

  • 入库时间 2022-08-18 11:48:02

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号