首页> 外文期刊>Mining Journal >BHP urges speedy diamond mine review
【24h】

BHP urges speedy diamond mine review

机译:必和必拓敦促迅速进行钻石矿审查

获取原文
获取原文并翻译 | 示例
           

摘要

Australia's Broken Hill Proprietary Co. (BHP) has urged the panel reviewing its proposed 500 million C dollars diamond mine in the Canadian Arctic to avoid delays in making a decision (MJ, February 24, p.144). The government has said that it expects the review process to take between a year and 18 months to complete although BHP believes that the study could go more quickly, thereby keeping capital costs in check. The Lac de Gras site, which reputedly contains one of the world's richest untapped diamond deposits, is in a remote area of barren tundra in the Northwest Territories and is accessible only in the winter when a road is carved over the area's frozen lakes. BHP's project manager, Bruce Turner said that if a development decision is postponed beyond mid-1996, the summer construction season will be lost, impacting on the joint venture partners' ability to get a good start on the development.
机译:澳大利亚的布罗肯希尔私有公司(BHP)已敦促小组审查其拟议中的位于加拿大北极地区的5亿加元钻石矿,以避免延误作出决定(MJ,2月24日,第144页)。政府已经表示,尽管必和必拓相信这项研究可以更快地进行,从而可以控制资本成本,但它预计审查过程将在一年到18个月之间完成。 Lac de Gras厂址据说是世界上最丰富的未开采钻石矿之一,位于西北地区贫瘠苔原的边远地区,只有在冬季在该地区的冻湖上刻一条路时才能进入。必和必拓的项目经理布鲁斯·特纳(Bruce Turner)说,如果将开发决定推迟到1996年年中以后,夏季施工季节将丢失,这将影响合资伙伴开始良好开发的能力。

著录项

  • 来源
    《Mining Journal》 |1995年第8323期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿山开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号