A second inquiry, into objections to the modifications proposed to the West Sussex Minerals Local Plan was held in November and December 2001. The Inspector's Report was received in February 2002. The main options for taking forward the Plan were:to await further guidance on the level of mineral the Council is expected to provide;to remove the three new sites from the Plan; ormake the modifications recommended by the Inspector and proceed towards the adoption of the Plan. It was considered in May that the only viable option was to make the modifications recommended by the Inspector and proceed towards the adoption of the Plan. The other options were likely to be counterproductive and contain too great a risk.
机译:在2001年11月和2001年12月对反对西萨塞克斯矿产地方计划的拟议修改提出了第二次调查。2002年2月收到了检查员的报告。推进该计划的主要选择是:等待有关该计划的进一步指导。预计理事会将提供的矿物水平;从计划中删除三个新站点;或进行检查员建议的修改,然后继续通过计划。 5月认为,唯一可行的选择是进行检查员建议的修改并着手通过该计划。其他选择可能适得其反,并且风险太大。

著录项

  • 来源
    《Mineral Planning》 |2002年第92期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号