首页> 外文期刊>Miners News >THUNDER MOUNTAIN GOLD UPDATES PROGRESS at SOUTH MOUNTAIN MINE
【24h】

THUNDER MOUNTAIN GOLD UPDATES PROGRESS at SOUTH MOUNTAIN MINE

机译:南山矿山的桑德山金矿更新进展

获取原文
获取原文并翻译 | 示例
           

摘要

Thunder Mountain Gold, Inc. (TSX-V: THM; OTCQB: THMG) (the Company), is pleased to provide an update for its South Mountain Project Joint Venture called Owyhee Gold Trust, in Owyhee County, Idaho. South Mountain Project Developments Include: Underground mine development continues at an excellent pace, with the underground development focusing on enlargement of the main Sonneman level to 12 feet by 12 feet to accommodate future production. Mining in the drift has advanced 1,350 feet from the portal, and the first significant historic ore zone, the Laxey zone, was encountered in May at about the 900 foot mark. Planned underground drilling will commence once the Sonneman has been developed another 600 feet toward the DMEA zone, estimated for mid-September. The initial underground detailed drilling will target the down dip extension of this zone.
机译:Thunder Mountain Gold,Inc.(TSX-V:THM; OTCQB:THMG)(公司)很高兴为其位于爱达荷州Owyhee县的South Mountain项目合资企业Owyhee Gold Trust提供更新。南山项目开发包括:地下矿山开发继续保持良好的步伐,地下开发重点是将Sonneman主层扩大到12英尺乘12英尺,以适应未来的生产。漂流中的采矿距离该门户高出1,350英尺,第一个重要的历史性矿区Laxey带在5月约900英尺处遇到。一旦Sonneman向DMEA地区发展了另外600英尺,预计将在9月中旬开始进行地下钻探。最初的地下详细钻探将针对该区域的下倾延伸。

著录项

  • 来源
    《Miners News》 |2013年第augaasepa期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号