...
【24h】

Appeals

机译:上诉

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In April Earsham Gravels Ltd and A J Goff Ltd lodged an appeal against non-determination by Norfolk CC of proposals for extraction of sand and gravel at Mundham. Consideration had been deferred in March (see Mineral Planning 91 p.47) to discuss highway matters further. Norfolk CC in May considered there should be an objection on the grounds that the extra traffic generated by the proposal would be detrimental to the free flow of traffic and to highway safety as the application does not include the necessary highway works to allow the free flow of traffic.
机译:4月,Earsham Gravels Ltd和A J Goff Ltd提出上诉,要求诺福克CC不裁定在Mundham开采沙子和碎石的提议。 3月已推迟考虑(参见《矿物规划》第91页第47页)以进一步讨论高速公路事务。诺福克(Norfolk CC)在5月份认为应该有异议,理由是提案所产生的额外交通将不利于交通的自由流通和高速公路安全,因为该申请不包括允许高速公路自由流通的必要公路工程。交通。

著录项

  • 来源
    《Mineral Planning》 |2002年第92期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号