...
首页> 外文期刊>Mineral Planning >Oil & gas/Offshore developments
【24h】

Oil & gas/Offshore developments

机译:石油/天然气/海上开发

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In June revised oil recovery forecasts for the Buzzard field suggested that it is the largest North Sea oil discovery in the last 25 years. EnCana, the operator, was poised to move to development planning with support from DTI. EnCana has drilled eight appraisal wells and sidetracks into the Buzzard structure north east of Aberdeen since its discovery in June 2001. EnCana estimated oil in place of between 850M and 1.1 billion barrels. EnCana aims to submit a Development Plan Approval in late 2002, with a target date for first oil production of late 2005. In June formal consent was given for Burlington Resources' Calder Field in the East Irish Sea. Calder has 250 billion cu.ft of gas reserves and 49,000 barrels of condensate. Production is expected towards the end of 2003. The Calder Field is the first of five fields in the "Rivers" cluster; the other four "Rivers" fields (Darwen, Crossans, Hodder and Ashland) will be produced as spare capacity becomes available in the Calder Facilities.
机译:6月,对Buzzard油田的石油采收率预测进行了修订,表明该油田是过去25年中最大的北海石油发现。运营商EnCana准备在DTI的支持下转向发展计划。自从2001年6月发现以来,EnCana已在阿伯丁东北部的Buzzard结构中钻了8个评估井和侧钻。EnCana估计,石油的储量在8.5亿至11亿桶之间。 EnCana的目标是在2002年底提交一份发展计划批准书,目标日期是2005年底首次生产石油。6月份,伯灵顿资源公司在东爱尔兰海的Calder油田获得了正式同意。卡尔德拥有2500亿立方英尺的天然气储量和49000桶凝析油。预计将于2003年底开始生产。Calder油田是“河流”集群中五个油田中的第一个;由于在Calder设施中将有剩余产能,将生产其他四个“河流”油田(Darwen,Crossans,Hodder和Ashland)。

著录项

  • 来源
    《Mineral Planning》 |2002年第92期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号