...
【24h】

Quarry update

机译:采石场更新

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In July North Yorkshire CC considered an update on progress with planning issues at Cridling Stubbs Quarry (see Mineral Planning 91 p.25). Frequent monitoring of the site had continued and while there had been some improvement in the noise situation since the new hydraulic excavator was employed it was clear that intermittent problems continued to occur. These appeared to stem from use of the pecker and the noise of the excavator bucket contacting hard stone during extraction operations. Wind direction played an important role in determining whether these activities caused noise disturbance in Cridling Stubbs. In an attempt to secure further improvements, the operator was requested to consider programming of operations involving use of the pecker so as to take place when the wind direction was away from Cridling Stubbs.
机译:7月,北约克郡地方委员会审议了Cridling Stubbs采石场规划问题的最新进展(请参阅《矿物规划》 91页25)。由于使用了新的液压挖掘机,因此对现场进行了持续的监视,并且在噪声情况有所改善的同时,很显然,间歇性问题仍在继续发生。这些似乎是由于啄木鸟的使用以及挖掘作业过程中挖掘机铲斗接触硬石的噪音引起的。风向在确定这些活动是否引起立桩的噪声中起着重要作用。为了确保进一步的改进,要求操作员考虑对涉及使用啄木鸟的操作进行编程,以便在风向远离卷帘树桩时进行。

著录项

  • 来源
    《Mineral Planning》 |2002年第92期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号