...
首页> 外文期刊>Mineral Planning >Sand extensions/Hermitage proposal reduced
【24h】

Sand extensions/Hermitage proposal reduced

机译:扩砂/隐居建议减少

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The extension to the sand quarry at Hermitage Farm, Bradley Court, Hermitage, by the Waste Recycling Group, was approved by West Berkshire Council in May. However, the quantity of mineral extraction proposed was substantially reduced. The application related to a quarry in which soft sand extraction and the disposal of household waste is currently taking place. Sand extraction had taken place since 1984 with restoration originally intended to be to agricultural land at a lower level; the sand extraction was permitted until December 2002. The planning application originally included the extraction of 750,000t of sand north of the existing quarry, and infilling with inert waste. Prior to a site visit taking place the applicant removed the major sand extraction proposals, so that only 55,000t would be extracted from the existing quarry. The application site is in the North Wessex Downs AONB to the north of the M4 motorway. The application would extend the time period for the completion of operations at the site by two years, and provide an additional 185,000 cu.m of void space, creating the cell for non-inert waste landfilling which would generate a further 30,000t of soft sand. This would take place in 2002 and be completed early 2003. A further 25,000t of sand would be extracted from a former nursery area adjacent to the quarry during 2003 following the sand extraction in the quarry. The quarry would be restored for agricultural purposes with further hedgerows and field boundaries being introduced to reduce field size. Restoration would be completed by the end of 2007.
机译:西伯克郡委员会于5月批准了废物回收小组对Hermitage布拉德利法院Hermitage农场的采石场的扩建。但是,提议的矿物提取量大大减少了。该应用程序与采石场有关,该采石场目前正在进行软砂提取和生活垃圾的处理。自1984年以来开始进行采砂,最初打算将其用于较低级别的农地;直到2002年12月才允许采砂。该规划申请最初包括在现有采石场以北开采750,000吨砂,并填充惰性废物。在进行实地考察之前,申请人取消了主要的采砂建议,因此仅从现有采石场中采出55,000吨。申请地点位于M4高速公路北部的North Wessex Downs AONB。该应用程序会将现场完成操作的时间延长了两年,并提供了额外的185,000立方米的空隙空间,从而创建了用于非惰性废物填埋的单元,将进一步产生30,000吨的软砂。这将在2002年进行,并于2003年初完成。在采石场采砂之后,在2003年期间将从邻近采石场的一个前苗圃区进一步采出25,000吨砂子。采石场将被恢复用于农业目的,同时将引入更多的树篱和引入田间边界以减小田间面积。恢复工作将于2007年底完成。

著录项

  • 来源
    《Mineral Planning》 |2002年第92期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号