Progress on a Review of the Essex Minerals Local Plan was considered by Essex CC in July. The current Minerals Local Plan (MLP) was adopted in 1996 and through the allocation of preferred sites makes provision for an adequate supply of primary land won aggregates to maintain a sufficient landbank throughout the plan period, based on MPG6. However, MPG6, published in 1994, was "widely acknowledged to be out of date". Permitted reserves of aggregates in Essex have remained consistently above the required seven years throughout the Plan period. Currently they stand at in excess of eleven years. However, there are reasons why it was considered timely to carry out the review.
机译:Essex CC在7月审议了Essex矿产地方计划审查的进展。当前的《矿产地方计划》(MLP)于1996年通过,通过分配优先地点,为基于计划制定的MPG6的充足原土地储备提供了充足的准备,以在整个计划期间维持足够的土地储备。但是,1994年发布的MPG6被“广泛认可已过时”。在整个计划期间,艾塞克斯的骨料允许储量一直保持在要求的七年以上。目前他们已经超过11年了。但是,出于某些原因,认为应该及时进行审查。

著录项

  • 来源
    《Mineral Planning》 |2002年第92期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号