...
首页> 外文期刊>Mineral Planning >Power/Drax petcoke application
【24h】

Power/Drax petcoke application

机译:电源/德拉克斯石油焦应用

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Consultation on use of petcoke at Drax will run until 11 October. In March the Environment Agency asked the operators of Drax Power station to submit information justifying a case for the long term burning of a coal-petroleum coke (petcoke) mixture if they wanted to progress an application to trial the fuel. This was submitted by July. The Agency informed AES Drax Power Ltd that it will treat the application to carry out an 18 month trial burn of a mixture of coal and petcoke as a request for a standard variation on its existing permission rather than one which involves a substantial change to the process. The Agency said that if Drax wants to change its current operation it needs to demonstrate that excessive cost would be incurred if the power station continued to use coal only.
机译:有关在Drax使用石油焦的咨询将持续到10月11日。 3月,环境局要求Drax电站的运营商提交信息,说明如果他们想继续进行试验以试用该燃料的话,就需要长期燃烧煤-石油焦炭(石油焦)混合物。这是七月提交的。原子能机构告知AES Drax Power Ltd,它将作为一项要求对其现有许可进行标准变更的请求,而不是对该过程进行实质性变更的请求,来处理将煤和石油焦的混合物​​进行18个月的试验燃烧的申请。原子能机构说,如果德拉克斯想要改变其目前的运营,则需要证明如果发电厂继续仅使用煤炭,将会产生过多的成本。

著录项

  • 来源
    《Mineral Planning》 |2002年第92期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号