...
首页> 外文期刊>Mining Journal >Dragon frustrated at Svartliden
【24h】

Dragon frustrated at Svartliden

机译:龙在Svartliden沮丧

获取原文
获取原文并翻译 | 示例
           

摘要

Dragon Mining NL, dual-listed on the Stockholm and Australian Stock Exchanges, is experiencing difficulties in obtaining the requisite permits for the development of its Svartliden gold project in Sweden. The Environmental Court has advised the company that a site inspection will not be made prior to final submissions by regulatory authorities. Given the time allowed by the court for these proceedings, it is unlikely that the inspection will be made before the onset of snow cover in the northern winter. Since the court has also indicated that site inspections must be made during snow-free periods, the implications are that the inspections will not now be made until about April next year.
机译:在斯德哥尔摩和澳大利亚证券交易所双重上市的Dragon Mining NL在获得必要的许可以开发其在瑞典的Svartliden黄金项目时遇到了困难。环境法院已通知该公司,在监管机构最终提交该文件之前,将不会进行现场检查。考虑到法院允许进行这些诉讼的时间,不太可能在北部冬季积雪开始之前进行检查。由于法院还指出,必须在无雪期间进行现场检查,因此隐含的含义是,直到明年4月左右才进行检查。

著录项

  • 来源
    《Mining Journal》 |2002年第8706期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿山开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号