...
首页> 外文期刊>Mineral Planning >Opencast coal/Bowburn permission
【24h】

Opencast coal/Bowburn permission

机译:露天煤矿/烧伤许可

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Durham CC in May permitted the construction, with associated ground stabilisation, of the A688 Wheatley Hill to Bowburn Link road, after an Article 14 direction was withdrawn. The proposal involves the construction of a 2.3 km long single carriageway road to the east of the A1 (M) Bowburn Interchange. Because of the presence of shallow coal deposits along part of the proposed route, various ground stabilisation measures are intended to safeguard the future integrity of the road. These include the removal of 10,000t of shallow, partially worked coal at the southern end of the scheme. Coal extraction would be undertaken prior to commencement of construction work on the road and it is envisaged that it would take about 4 months.
机译:5月,达勒姆(Durham)CC撤消了第14条指示后,允许建造A688惠特利山(Wheatley Hill)至Bowburn Link公路,并进行了相关的地面稳定处理。该提案涉及在A1(M)Bowburn立交桥以东建造一条长2.3公里的单车道。由于拟议路线的一部分存在浅煤沉积物,因此各种地面稳定措施旨在维护道路的未来完整性。这些措施包括在该计划的南端清除10,000吨浅的,部分加工的煤炭。采煤将在道路上的建筑工作开始之前进行,预计将需要大约4个月的时间。

著录项

  • 来源
    《Mineral Planning》 |2002年第92期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号