...
首页> 外文期刊>Miners News >Second Cat~R GH800B Longwall Plow System Goes To Thin-Seam Anthracite Mine
【24h】

Second Cat~R GH800B Longwall Plow System Goes To Thin-Seam Anthracite Mine

机译:第二个Cat〜R GH800B长壁刨煤机系统进入薄煤层无烟煤矿

获取原文
获取原文并翻译 | 示例

摘要

The German Ibbenburen mins is adding a second Cat~R GH800B Longwall Plow System to recover its thin seam of anthracite coal-averaging only 1.04 meters thick. RAG Anthrazit IbbenbOren GmbH placed the order for a second system based on the productive performance of the first Cat GH800B system. IbbenbOren installed the very first GH800B system in late 2013, and it has been effectively working in heights of 0.8 to 1.2 meters. The new system is scheduled to start producing in July on a 220-meter face.
机译:德国Ibbenburen矿工正在增加第二个Cat〜R GH800B长壁刨煤机系统,以恢复其平均厚度仅为1.04米的无烟煤薄煤层。 RAG Anthrazit IbbenbOren GmbH根据第一台Cat GH800B系统的生产性能订购了第二套系统。 IbbenbOren在2013年末安装了首个GH800B系统,该系统已在0.8至1.2米的高度上有效工作。新系统计划于7月在220米长的面板上开始生产。

著录项

  • 来源
    《Miners News 》 |2015年第apraamay期| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程 ;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号