首页> 外文期刊>Mining Engineering >Evaluation of operational strategies for heap leaching of gold ores tinder subzero temperatures, Coffee Project, Kaminak Gold
【24h】

Evaluation of operational strategies for heap leaching of gold ores tinder subzero temperatures, Coffee Project, Kaminak Gold

机译:评价金矿火种低于零温度的堆浸操作策略,咖啡项目,卡米纳克金矿

获取原文
获取原文并翻译 | 示例
           

摘要

Cyanide heap leaching of gold ores in areas with extremely low winter temperatures requires special considerations to prevent freezing of the leach solution. Factors that impact the solution temperature include ore temperature at the time of stacking and during operation, burial of drip irrigation lines, use of geomembrane covers and heating of the leach solution. Thermodynamic modeling was performed to simulate expected ore and solution temperatures under different operating strategies for Kaminak Gold's Coffee gold project in the Yukon Territory. Mean monthly temperatures at the site ranged from a low of -22.5 °C (-8.5 °F) to a high of 13.6 °C (56.4 °F), while in situ ore temperatures ranged from -0.5° to about -1.5 °C (31 ° to 29 °F).The modeling results were used to optimize the operational parameters and indicated that a combination of drip line burial and heating of the leach solution during the winter months was required to maintain solution temperatures above freezing during the initial years of stacking, although as the size of the heap increased, heating was no longer necessary.
机译:在冬季温度极低的地区,氰化物堆浸金矿石需要特别考虑,以防止浸出液冻结。影响溶液温度的因素包括堆叠时和操作过程中的矿石温度,滴灌管线的埋葬,土工膜盖的使用以及浸出溶液的加热。进行了热力学建模,以模拟育空地区Kaminak Gold的Coffee gold项目在不同操作策略下的预期矿石和溶液温度。现场平均月温度范围从-22.5°C(-8.5°F)的低到13.6°C(56.4°F)的高,而原矿温度范围从-0.5°到约-1.5°C (31°F到29°F)。使用建模结果优化了运行参数,并指出在冬季,滴灌线埋入和浸出液加热需要结合使用,以保持最初几年的溶液温度高于冰点尽管堆的大小增加了,但不再需要加热。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号