首页> 外文期刊>Mining Engineering >Newmont picks Metso in Peru; Metso will supply mills to Yanacocha Conga project
【24h】

Newmont picks Metso in Peru; Metso will supply mills to Yanacocha Conga project

机译:纽蒙特在秘鲁选择了美卓;美卓将为Yanacocha Conga项目提供工厂

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

NEWMONT MINING Corp. plans to move forward with its plans for the Yanacocha Conga copper-gold project in Peru and has selected Metso to design and supply a 12.8-m x 7.6-m (42-ft x 25-ft) 28 MW gearless semiautogenous grinding (SAG) mill, plus two 7.9-m x 12.8-m (26-ft x 42-ft) 15.6 MW ball mills and two VTM-1500-WB Vertimills for the project. The 12.8-m- (42-ft-) diameter SAG mill is the world's largest and is the first of its kind.
机译:NEWMONT MINING Corp.计划继续推进其在秘鲁的Yanacocha Conga铜金项目的计划,并已选择美卓设计和供应12.8-mx 7.6-m(42英尺x 25英尺)28 MW无齿轮半自动研磨机(SAG)磨机,以及该项目的两台7.9-mx 12.8-m(26英尺x 42英尺)15.6 MW球磨机和两台VTM-1500-WB Vertimills。直径12.8米(42英尺)的SAG轧机是世界上最大的,也是同类产品中的第一个。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号