...
首页> 外文期刊>Mining Engineering >Geometallurgy for two recovery process operations at Cripple Creek & Victor gold mine
【24h】

Geometallurgy for two recovery process operations at Cripple Creek & Victor gold mine

机译:克里普普尔克里克(Cripple Creek)和维克多(Victor)金矿的两个回收工艺操作的地质冶金

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Cripple Creek and Victor (CC&V) Gold Mine (Cresson Project) (Fig. 1) is undergoing an expansion to extend production to the year 2025. This expansion involves building a high-grade ore mill, another valley leach facility (VLF) for heap leach operations and expanding the overburden storage areas. The current operating pits are progressing downward from the oxide ore into a more sulfide and telluride-rich orebody. There is still oxide ore present in the current pits and planned pits not yet mined. There is an increased need for two recovery processes for these two different types of ore.
机译:克里普普尔克里克和维克多(CC&V)金矿(克雷森项目)(图1)正在进行扩建,将生产延长至2025年。扩建包括建造一座高品位矿石厂,这是另一座谷浸出设施(VLF)堆浸操作和扩大覆盖层存储区域。当前的工作矿井正在从氧化物矿向下发展成硫化物和碲化物含量更高的矿体。当前矿井和计划开采的矿井中仍存在氧化物矿石。对于这两种不同类型的矿石,越来越需要两种回收方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号