首页> 外文期刊>Mineral Law Newsletter >Ninth Circuit Rules That ESA Consultation Is Not Triggered When an Agency Decides Not to Require a Plan of Operations
【24h】

Ninth Circuit Rules That ESA Consultation Is Not Triggered When an Agency Decides Not to Require a Plan of Operations

机译:第九条电路规则,当代理商决定不要求执行行动计划时,不触发ESA协商

获取原文
获取原文并翻译 | 示例
           

摘要

In Karuk Tribe v. U.S. Forest Service,___F.3d___, 2011 WL 1312564 (9th Cir. Apr. 7,2011), the Ninth Circuit ruled that the U.S. Forest Service (Forest Service) is not required to engage in consultation under Section 7 of the Endangered Species Act (ESA), 16 U.S.C. § 1536(a)(2), when it determines that a proposed mining operation does not require a plan of operations (POO). One judge "respectfully but emphatically" disagreed. Karuk, 2011 WL 1312564, at *12.
机译:在Karuk Tribe诉美国森林服务局,___ F.3d ___,2011年WL 1312564(9th Cir。Apr. 7,2011)中,第九巡回法院裁定,根据第7条,不需要美国森林服务局(森林服务局)进行咨询USC 16号濒危物种法(ESA)第1536(a)(2)条,当它确定拟议的采矿作业不需要作业计划(POO)时。一位法官“尊敬但有重点地”不同意。 Karuk,2011年,WL 1312564,* 12。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号