...
首页> 外文期刊>Applied stochastic models in business and industry >A periodical replacement model based on cumulative repair-cost limit
【24h】

A periodical replacement model based on cumulative repair-cost limit

机译:基于累计维修成本限额的定期更换模型

获取原文
获取原文并翻译 | 示例

摘要

This paper considers a periodical replacement model based on a cumulative repair-cost limit, whose concept uses the information of all repair costs to decide whether the system is repaired or replaced. The failures of the system can be divided into two types. One is minor failure that is assumed to be corrected by minimal repair, while the other is serious failure where the system is damaged completely. When a minor failure occurs, the corresponding repair cost is evaluated and minimal repair is then executed if this accumulated repair cost is less than a pre-determined limit L, otherwise, the system is replaced by a new one. The system is also replaced at scheduled time T or at serious failure. Long-run expected cost per unit time is formulated and the optimal period T{sup}* minimizing that cost is also verified to be finite and unique under some specific conditions.
机译:本文考虑了一种基于累积维修成本限制的定期更换模型,其概念使用所有维修成本的信息来决定是维修还是更换系统。系统的故障可分为两种类型。一种是假定通过最小修复来纠正的轻微故障,而另一种是系统完全损坏的严重故障。当发生轻微故障时,将评估相应的维修成本,如果累积的维修成本低于预定的极限 L,则执行最小修复,否则,系统将被新系统替换。系统也会在预定时间 T 或严重故障时更换。制定了每单位时间的长期预期成本,并验证了最小化该成本的最优周期T{sup}*在某些特定条件下是有限的和唯一的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号