首页> 外文期刊>Gold Gazette >Excitement on two fronts at Peak Hill
【24h】

Excitement on two fronts at Peak Hill

机译:山顶两个方面的兴奋

获取原文
获取原文并翻译 | 示例
       

摘要

Alkane Exploration NL's latest find at its PeakHill copper project in New South Wales could lead to Australia'sfirst sulphide bioheap leach operation. The discovery of a largesulphide mineralised zone beneath the project's Properitary oxidedeposit had prompted the scoping study by Signet EngineeringPty Ltd, which was completed last month. Sulphide bio-heapleaching used the same processes as oxide operations, and thatPeak Hill ore seemed particularly suited to this treatment. Alkaneis aiming for its 100%owned heap leach mine at Peak Hill toyield 100, 000 oz per annum by the year 2,000.
机译:Alkane Exploration NL在其位于新南威尔士州的PeakHill铜矿项目中的最新发现可能会导致澳大利亚首次进行硫化物生物堆浸操作。在该项目的固有氧化物沉积物下方发现了一个大硫化物矿化带,这促使Signet EngineeringPty Ltd进行了范围界定研究,该研究于上个月完成。硫化物生物堆浸使用与氧化物操作相同的过程,Peak Hill矿石似乎特别适合这种处理。 Alkaneis的目标是在其山顶山100%拥有的堆浸矿,到2,000年,每年可生产100,000盎司。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号