Red Back Mining NL has embarked on a 5,000 metre RC drilling program in a bid to increase the resource/reserve inventory at its Chirano project in Ghana.Initial results include 6 metres at 7.91 grams/tonne from Akwaaba and 12m at 3.7 g/t from Mamnao, not included in the current resource inventory.
展开▼
机译:Red Back Mining NL已开始进行5,000米RC钻探计划,以增加其在加纳的Chirano项目的资源/储量库存,初步结果包括来自阿夸瓦巴(Akwaaba)的6米,每吨7.91克/吨,以及12m,3.7克/吨的自Mamnao,不包括在当前资源清单中。
展开▼