首页> 外文期刊>Gold & Minerals Gazette >Taking the final steps
【24h】

Taking the final steps

机译:采取最后步骤

获取原文
获取原文并翻译 | 示例
           

摘要

Austindo Resources Corporation NL is poised to begin construction at its flagship Cibaliung old project in Java, Indonesia. The project is a joint venture between Austindo, which holds 83.76 percent, and its Indonesian partner PT Antam Tbk (owner of the remaining 16.24 percent). The partners will be tapping into a reserve base of 1.388 million tonnes at the gold equivalent grade of 10.5 grams/tonne for 467,000 contained ounces. The six-year project has an estimated capital expenditure of 37 million US dollars with an operating expenditure of less than 200/oz US dollars.
机译:Austindo Resources Corporation NL准备在印度尼西亚爪哇的旗舰Cibaliung旧项目中开始建设。该项目是拥有83.76%股权的Austindo和其印度尼西亚合作伙伴PT Antam Tbk(其余16.24%的所有者)之间的合资企业。合作伙伴将利用138.5万吨的储量基础,黄金当量品位10.5克/吨,含467,000盎司。这个为期六年的项目估计资本支出为3,700万美元,运营支出不到200美元/盎司。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号