首页> 外文期刊>Gold & Minerals Gazette >Project pipeline continues to expand for Areva
【24h】

Project pipeline continues to expand for Areva

机译:阿海珐的项目管道继续扩大

获取原文
获取原文并翻译 | 示例
           

摘要

THE TASK AT hand now for the nuclear industry is to rebuild the supply chain to support increasing demand, according to Areva Australia NC's Dr Selena Ng. Holding the mantle as the only fully integrated uranium supplier across the fuel cycle, Areva has constructed more than 100 nuclear power plants around the globe since the 1970s. "Looking forward, we estimate there will be more than 300 new nuclear reactor plants constructed over the next decade," Dr Ng said. "More and more countries are turning to nuclear power as part of their energy mix." In terms of its future, Areva is building the first evolutionary pressurised reactor (EPR) in Canada, which is due to come on line in 2011.
机译:阿海珐澳大利亚公司的Selena Ng博士说,目前核工业要解决的问题是重建供应链以支持不断增长的需求。自1970年代以来,阿海珐集团一直是整个燃料循环中唯一的完全一体化铀供应商,因此在全球范围内已建造了100多个核电站。吴博士说:“展望未来,我们估计在未来十年内将建造300多个新的核反应堆工厂。” “越来越多的国家将核能作为其能源结构的一部分。”就其未来而言,阿海珐集团正在加拿大建造首座演化型加压反应堆(EPR),该反应堆将于2011年投产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号