首页> 外文期刊>Gold & Minerals Gazette >Seppelt moves closer closer to production start-up
【24h】

Seppelt moves closer closer to production start-up

机译:Seppelt离生产启动越来越近

获取原文
获取原文并翻译 | 示例
           

摘要

Striker Resources NL could soon join the diamond producer ranks if all goes to plan at its Seppelt project in the Kimberleys of Western Australia, while its Merlin project in the Northern Territory is also starting to take shape. The 2004 work program is focused on assessing the viability of open pit mining at Seppelt 2, Seppelt 1 and Seppelt 5 as well as assessing the potential for underground mining at Seppelt 2 and Seppelt 5. A combined inferred open pit resource of 450,000 carats exists within the project area. The largest diamonds recovered to date includes one 's measuring 6.3 cts and one 8.4 cts. A pilot modular HMS processing facility at Seppelt 2 has been scaled up to process about 20,000 tonne of material at a rate of up to 30t/hour.
机译:如果所有人都计划在西澳大利亚州金伯利的Seppelt项目中计划一切,Striker Resources NL可能很快就会加入钻石生产商行列,而其在北领地的Merlin项目也已初具规模。 2004年的工作计划的重点是评估Seppelt 2,Sepelt 1和Seppelt 5的露天采矿的可行性,以及评估Seppelt 2和Seppelt 5的地下采矿的潜力。据推测,该矿场共拥有45万克拉的露天矿资源项目区域。迄今为止,回收的最大钻石包括一颗6.3克拉和一颗8.4克拉的钻石。位于Seppelt 2的试验性模块化HMS处理设施已扩大规模,以每小时30吨的速度处理约20,000吨的材料。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号