首页> 外文期刊>Gold & Minerals Gazette >Bowen Basin charge begins
【24h】

Bowen Basin charge begins

机译:博文盆地开始充电

获取原文
获取原文并翻译 | 示例
           

摘要

WITH ITS ISAAC Plains coal mine in Queensland ramping up production over the next two years on the back of its developing its Isaac Plains South project, Aquila Resources Ltd continues to expand and grow its coal portfolio in the state. Isaac Plains represents Aquila's initial production source in the Bowen Basin and is targeting production of 1.2 million tonnes per annum this year before rising to 2.8 Mtpa by 2010 (in line with the planned port expansion at Dakymple Bay Coal Terminal). At the same time, the company is progressing study work on the larger scale HCC projects Peak Downs east and Belvedere under its Bowen Central and Belvedere joint ventures with Vale Ltd.
机译:昆士兰州的ISAAC Plains煤矿在开发其Isaac Plains South项目后,在未来两年内提高了产量,Aquila Resources Ltd继续扩大和发展该州的煤炭产品组合。艾萨克平原(Isaac Plains)是天鹰座在Bowen盆地的最初生产来源,今年的目标是每年生产120万吨,然后在2010年之前提高到2.8 Mtpa(与计划在Dakymple Bay煤炭码头扩建的港口保持一致)。同时,该公司正在与Vale Ltd.在Bowen Central和Belvedere的合资企业下,对东区Peak Downs和Belvedere的大型HCC项目进行研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号