【24h】

Mining deadline set

机译:设定采矿期限

获取原文
获取原文并翻译 | 示例
           

摘要

Turning Its Gullewa project Elm Western Australia's Mid West into a 60,000 ounce per annum producer by the end of December is just the first step for Perth-based junior Batavia Mining Ltd. The junior exploration house already has three high priority exploration targets near Deflector - the ore body it plans to mine first - as it continues to build up its regional resource inventory to 1 million oz. As it stands, Deflector will be an open pit and underground operation with a four to five year mine life and a cash operating cost below 330 dollars gold oz equivalent. Drilling has returned intercepts like 8 metres at 41 grams/tonne gold and 2.9 percent copper, 6m at 5.1 g/t gold and 0.34 percent copper as well as the promising 4m at 23.4 g/t gold beneath the old Deflector West pit.
机译:到12月底,将其Gullewa项目榆木西澳大利亚州中西部的年产量提高到60,000盎司,这只是珀斯初级Batavia Mining Ltd的第一步。初级勘探公司已经在Deflector附近拥有了三个优先勘探目标-计划首先开采的矿体-它将继续将其区域资源库存增加到100万盎司。按照目前的情况,Deflector将是一个露天矿和地下矿,具有四到五年的矿山寿命,现金运营成本低于330美元的金盎司等价物。钻探返回了截距,例如在41克/吨的金和2.9%的铜的8米,在5.1克/吨的金和0.34%的铜的6m处以及在旧的Deflector West矿坑下有希望的4m的金在23.4 g / t的处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号