首页> 外文期刊>Gold & Minerals Gazette >Mincor erodes costs in tougher nickel times
【24h】

Mincor erodes costs in tougher nickel times

机译:Mincor在艰难的镍时代侵蚀成本

获取原文
获取原文并翻译 | 示例
           

摘要

Mincor Resources NL (ASX:MCR) has found a few reasons to smile with its costs per tonne of nickel ore down 15% over the 2011 financial year, due to operational restructuring.In February Mincor reported cash costs per pound of nickel to be down 24% group wide over the 2011 financial year.The company has been mining its flagship Kambalda nickel operations for 11 years and has production scheduled through to 2016 based on current ore reserves.
机译:Mincor Resources NL(ASX:MCR)发现了一些理由,由于运营重组,其每吨镍矿石成本比2011财政年度下降了15%。2月,Mincor报告称每磅镍的现金成本下降了。在2011财年,集团拥有24%的股份。该公司已经开采了11年的旗舰Kambalda镍业务,并根据目前的矿石储量计划到2016年进行生产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号