首页> 外文期刊>Gold & Minerals Gazette >Crunch time approaching
【24h】

Crunch time approaching

机译:关键时间临近

获取原文
获取原文并翻译 | 示例
           

摘要

Proponents behind one of the most closely-watched green-fields exploration plays in Australia should know by mid-year whether to advance the project to the first stage of due diligence. Joint venture partners Minotaur Resources Ltd and Oxiana Ltd are currently completing a 2.5 million dollars 14,000 metre combined RC and diamond drilling program to establish a JORC-compliant estimate for their Prominent Hill hydrothermal copper-gold-iron oxide prospect in central South Australia. Early results from the latest field work have been encouraging, with intersections of 103 metres at 2.52 percent copper and 1.10 grams/tonne gold (from 53-256m) and 133m at 1.74 percent copper and 1.36 8/t gold (264-397m) in the eastern edge of Prominent Hill's mineralisation.
机译:在澳大利亚最受关注的绿地勘探区之一的支持者应该在年中之前知道是否将该项目推进到尽职调查的第一阶段。合资伙伴Minotaur Resources Ltd和Oxiana Ltd目前正在完成一项耗资250万美元的14,000米RC和钻石组合钻探计划,以为其南澳大利亚中部Prominent Hill水热铜金铁氧化物矿床建立符合JORC要求的估算。最新的现场工作的早期结果令人鼓舞,相交的相距103米处铜的2.52%和金1.10克/吨(来自53-256m)和133m相处的铜的1.74%和1.36 8 / t金(264-397m)。 Prominent Hill矿化的东部边缘。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号