Platinum Australia Ltd considers 'itself on track to complete its bankable feasibility study on its Smokey Hills platinum group metals project in South Africa's Bushveld Igneous Complex during June. In April Snowden Mining Industry Consultants came up with a diluted measured and indicated UG2 Reef resource estimate of 5.3 million tonnes grading 5.61 grams/tonne of platinum, palladium, rhodium plus gold for 960,000 ounces of contained metal. Estimated geological losses of 21 percent due to potholes, dykes, faults, rolling reefs and pegmatite were involved in the calculation. The undiluted grade was estimated to be 8.6 g/t 4E PGM. Estimates were based on 68 diamond drill holes along with other analyses. The Smokey Hills BFS was examining an initial open-cut with relatively shallow underground works, plus on-site treatment, plus delivery to smelters. GRD Minproc, Africa Geo-Environmental Services and SRK Consulting are also involved in the BFS activities. In a review of operations accompanying Platinum Australia's December 2005 financial report, the company said it envisaged a potential 95,000 oz per anum 4E operation over a seven-year mine life.
机译:铂金澳大利亚公司认为,“自己已按计划完成了其于6月在南非布什维尔德火成岩综合体的Smokey Hills铂族金属项目的可融资可行性研究。 4月,Snowden矿业顾问提出了稀释的测量值,并表示960万盎司铂,钯,铑和金中5.6克/吨的铂金,钯,铑和金的品位估计为530万吨UG2礁石,估计为530万吨。由于坑洼,堤坝,断层,礁石和伟晶岩而造成的估计地质损失为21%。未稀释品级估计为8.6 g / t 4E PGM。估计是基于68个金刚石钻孔以及其他分析得出的。 Smokey Hills BFS正在研究初期的露天开采,该地下开采相对较浅的地下工程,再加上现场处理,再交付给冶炼厂。 GRD Minproc,非洲地质环境服务和SRK Consulting也参与了BFS活动。在对澳大利亚铂金公司2005年12月的财务报告进行的运营回顾中,该公司表示,它预计在7年的矿山使用寿命中,每年可能进行95,000盎司的4E运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号