首页> 外文期刊>Gold & Minerals Gazette >Strategy pays off for miner
【24h】

Strategy pays off for miner

机译:战略为矿工带来回报

获取原文
获取原文并翻译 | 示例
           

摘要

Dragon Mining NL is to proceed with a staged development of the Vammala production centre in southern Finland that will see mining begin later this year and gold production from its Vammala plant starting before the end of 2005. The latter will be Dragon's second gold production centre, the Svartliden gold mine in northern Sweden (which started production in March) being the first. Vammala's first stage of development will include production from the Sarvisuo Lodes at the underground Drives! mine and from two small open cuts at the new Jokisivu operation. Stage two, starting 18 months after the initial phase, will encompass an underground mine at Jokisivu. Prior to going underground, a six month drilling program will be undertaken to allow a detailed underground mine design and financial study to be completed.
机译:Dragon Mining NL将在芬兰南部的Vammala生产中心进行分阶段开发,该中心将于今年晚些时候开始开采,其Vammala工厂的黄金生产将于2005年底前开始。后者将成为Dragon的第二个黄金生产中心,瑞典北部的Svartliden金矿(于3月开始生产)是第一座。 Vammala的第一阶段开发将包括地下Drives的Sarvisuo Lodes的生产!矿山和新的Jokisivu作业中的两个小型露天矿。从初始阶段开始的18个月开始的第二阶段将包括Jokisivu的地下矿山。在进入地下之前,将进行为期六个月的钻探计划,以完成详细的地下矿山设计和财务研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号