首页> 外文期刊>Gold & Minerals Gazette >Sino prepares for first Jinfeng gold pour
【24h】

Sino prepares for first Jinfeng gold pour

机译:信和为首次金丰倒金做准备

获取原文
获取原文并翻译 | 示例
           

摘要

Sydney-based Sino Gold Ltd has increased the mineral resource estimate at its Jinfeng gold project - considered to be the largest known Carlin-type deposit in China - to 25.3 million tonnes at 5 grams/tonne gold, containing 4.04 million ounces (in situ at 2 g/t gold cut-off grade). This figure is a 17 percent increase on the previous resource estimate of 20 Mt at just on 5 g/t gold, containing 3.45 million oz. The new estimate includes measured and indicated resources totalling 21.1 Mt at 4.9 g/t gold, containing 3.32 million oz, representing a 40 percent increase of 956,000 oz.
机译:悉尼的Sino Gold Ltd已将其金凤金矿项目(据认为是中国已知的最大的卡林型矿床)的矿产资源估计值提高至2,530万吨(5克/吨金,含404万盎司,原位为2克/吨的金边界品位)。这个数字比先前的估计资源20吨(仅含5克黄金/吨,含345万盎司)增加了17%。新的估算包括在4.9 g / t黄金中总计21.1 Mt的实测和指示资源,含332万盎司,增加了956,000盎司,增长了40%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号