...
首页> 外文期刊>Michigan Oil & Ges News: Monthly Report Edition >Merit Energy evaluating horizontal drain hole drilled from existing Richfield Zone well in Norwich Unit secondary recovery waterflood project
【24h】

Merit Energy evaluating horizontal drain hole drilled from existing Richfield Zone well in Norwich Unit secondary recovery waterflood project

机译:Merit Energy评估了Norwich Unit二次采水项目中现有Richfield Zone井钻的水平排水孔

获取原文
获取原文并翻译 | 示例
           

摘要

MISSAUKEE COUNTY, Mich.—Merit Energy Co. has successfully completed drilling of the first horizontal drain hole in the East Norwich Field's Norwich Unit secondary recovery waterflood.Beckman Production Services Rig 32 and Panther Drilling Systems reached a measured total depth of 6,945 feet (4,455 feet true vertical) on the Norwich 4-133 HD-1 (SL: NW NW SE, Sec 12-T24N-R5W, Norwich Twp., Missaukee Co.) on June 7, according to Michigan Department of Environmental Quality, Office of Oil, Gas & Minerals (OOGM) field geologist Bill Duley.
机译:密歇根州密苏卡县—美利德能源公司已成功完成了东诺里奇油田诺里奇单元二次采水注水井中的第一个水平排水孔的钻探。贝克曼生产服务钻机32号和黑豹钻井系统的总测得深度为6,945英尺(4,455英尺)根据密歇根州石油办公室环境质量部的数据,6月7日,在Norwich 4-133 HD-1(SL:NW NW SE,Sec 12-T24N-R5W,Norwich Twp。,密苏基州)上安装了英尺(垂直) ,天然气和矿产(OOGM)现场地质师Bill Duley。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号