首页> 外文期刊>Metalurgija >OPTIMAL REPLACEMENT TIME ESTIMATION FOR MACHINES AND EQUIPMENT BASED ON COST FUNCTION
【24h】

OPTIMAL REPLACEMENT TIME ESTIMATION FOR MACHINES AND EQUIPMENT BASED ON COST FUNCTION

机译:基于成本函数的机器和设备的最佳更换时间估计

获取原文
获取原文并翻译 | 示例
       

摘要

The article deals with a multidisciplinary issue of estimating the optimal replacement time for the machines. Considered categories of machines, for which the optimization method is usable, are of the metallurgical and engineering production. Different models of cost function are considered (both with one and two variables). Parameters of the models were calculated through the least squares method. Models testing show that all are good enough, so for estimation of optimal replacement time is sufficient to use simpler models. In addition to the testing of models we developed the method (tested on selected simple model) which enable us in actual real time (with limited data set) to indicate the optimal replacement time. The indicated time moment is close enough to the optimal replacement time t*.
机译:本文涉及估算机器的最佳更换时间的多学科问题。可以使用优化方法的机器类别为冶金和工程生产。考虑了成本函数的不同模型(具有一个变量和两个变量)。通过最小二乘法计算模型的参数。模型测试表明,这一切都足够好,因此对于最佳替换时间的估计就足以使用更简单的模型。除了测试模型外,我们还开发了方法(在选定的简单模型上进行了测试),该方法使我们能够实时(具有有限的数据集)实时指示最佳更换时间。所指示的时刻足够接近最佳更换时间t *。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号