首页> 外文期刊>Metallurgical Plant and Technology International >Operational results of the 120 t DC-Arc furnace at stahlwerk thuringen, Germany
【24h】

Operational results of the 120 t DC-Arc furnace at stahlwerk thuringen, Germany

机译:德国Stahlwerk图林根120 t DC-Arc炉的运行结果

获取原文
获取原文并翻译 | 示例
       

摘要

During the four years of operation since its startup in early 1995 the 120 t DC-Arc furnace at Stahlwerk Thuringen has produced 2.5 million t of liquid steel. As long-time average values a power-on time of 40 min, power consumption of 340 kWh/tand refractory consumption of 1.9 kg/t have been reached. The fin-type anode has proven its long lifetime and high degree of reliability. Also the ladle furnace and the beam blank caster have achieved a high productivity level.
机译:自1995年初启动以来的四年运营中,位于Stahlwerk Thuringen的120 t DC-Arc炉生产了250万吨液态钢。作为上电时间的平均值(40分钟),已达到340 kWh / t的能耗和1.9 kg / t的耐火材料能耗。鳍片型阳极已证明其使用寿命长且可靠性高。钢包炉和束坯连铸机也达到了很高的生产率水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号