首页> 外文期刊>Canadian Mining Journal >Infrastructure projects during a downturn
【24h】

Infrastructure projects during a downturn

机译:经济低迷时期的基础设施项目

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Listening to the rhetoric, many may think now is the time to build infrastructure. It's a common belief that when the economy is in a downturn, most elements of a project are less expensive. But that's simply not true. And because income streams are shallow right now due to low commodity prices, capital projects must be executed very carefully. While things like material and labour typically have a set price tag, the biggest determinant of the overall cost of an infrastructure project can often be time. Time can be harder to quantify and is difficult to constrain if- or, in many cases, when - the unexpected happens. Time is, and should be, a constant concern from the beginning of planning until project completion. In order to mitigate time-related costs, you need to start with a good business case, and translate that into a development plan. Once that's established, project management must then be as efficient as possible. When you introduce delays, that will be the biggest driver of increasing costs.
机译:听了这些言论,许多人可能会认为现在是构建基础架构的时候了。人们普遍认为,当经济不景气时,项目的大多数要素都将变得不那么昂贵。但这根本不是真的。而且由于大宗商品价格低廉,目前收入来源很浅,因此必须非常谨慎地执行资本项目。尽管诸如材料和人工之类的东西通常具有固定的价格标签,但基础设施项目总成本的最大决定因素通常是时间。时间可能难以量化,并且如果(或在许多情况下)在意外情况发生时,则难以约束时间。从计划开始到项目完成,时间是并且应该一直是关注的焦点。为了减轻与时间相关的成本,您需要从一个好的业务案例开始,并将其转化为开发计划。一旦建立,项目管理就必须尽可能地高效。当您引入延迟时,这将是增加成本的最大驱动力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号