...
【24h】

Tin Highlights

机译:狂热的

获取原文
获取原文并翻译 | 示例

摘要

Workers at Minsur's Funsur tin refinery in Peru reached a payment deal on January 6, ending a month-long strike. The 40,000 tpy plant resumed production the following day, and is now ramping back up to full capacity. There has been no confirmation from the company about how much production has been lost, but we calculate that a full shutdown during the period of industrial action could have resulted in a loss of 3,500 tonnes. Over half of Funsur's production is exported to the USA, so this market would have suffered most from the downtime. However, the strike occurred over the quiet seasonal holiday period and therefore had little impact on tin consumers.
机译:1月6日,Minsur秘鲁Fu​​nsur锡冶炼厂的工人达成了付款协议,结束了为期一个月的罢工。年产能为40,000吨的工厂于第二天恢复生产,目前正逐渐恢复满负荷生产。该公司尚未确认损失了多少产量,但我们计算出,在采取工业行动期间完全停产可能造成3500吨的损失。 Funsur产品的一半以上出口到美国,因此停机将给该市场造成最大的损失。但是,罢工发生在安静的季节性假期期间,因此对锡的消费者影响不大。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号